Thanks to you, we are celebrating our 25th anniversarytreeofhopefoundation.pk Founding Festival

treeofhopefoundation.pk

For more information Here​
My Store My Store change

popular ! Heavy Duty Clothing Garment Rack Rolling Clothes Organizer Double Rails Hanging

※treeofhopefoundation.pk Limited model
YouTubers have introduced us to the usability of our products!
Introducing video here

Online sales
Price (tax included)

57 USD

  • Register your Komeri Card Number and pay with Komeri Card
    Comeri Point : Earned 5 points​

About Komeri Points

Reduce the number of items purchased
Increase the number of items purchased

Pick up at the store Pick up at the store
(on the house fulfillment)

Pickup store:

Choose a view

Check nearby stores

Estimated transport time:

request by

1pm → Prepare by 5pm​

5pm → Prepare by The next morning

How to receive and shipping fees

Add to Cart

Delivery shipping

Estimated transport time:

transport is scheduled for around 2026/01/21.

Cash on delivery is limited to credit or cash on delivery. For other payment methods, please refer to here.

*It may take a few time for the product to be delivered on January Wednesday, or public holidays, and depending on stock availability.

Regarding same-day shipping conditions

How to receive and shipping fees

Get It Now

Add to wish list

Added to wish list

More information about Heavy Duty Clothing Garment Rack Rolling Clothes Organizer Double Rails Hanging

Size:

*Slender long tube X2: Φ19mm; Long 750mm

*Thick long tube X6: Φ25mm; Long 750mm

*Long tube X4: Φ22mm; Long 750mm

*Middle tube X4: Φ22mm; Long 370mm

*Thin middle tube X4: Φ16mm; Long 740mm

*Short tube X2: Φ22mm; Long 260mm

*Straight tee X8

*Tube cap X6

*Base X2

*Connector X2

*Universal wheel x4




Installation steps:


1. Take 2 slender tubes, 2 plugs into the side of the base, and then take the thick 2 long tubes inserted into the baseabove.

2. First take 2 connectors and 4 thin tubes, put it together and put it into the thick tube, take 4 straight tees and 2 short pipes.

3. Take 4 long tubes, insert into the straight tee.

4. Take 2 thick long tubes, install straight tee at both ends. Then insert it into the long tube.

5. Take 4 middle tubes, insert into the straight tee respectively, take 4 caps to close the mouth of the tube. Assembly is completed.

Search for products in the same category

Bestseller ranking

View more this category

People who viewed this product also viewed these products

Products from nearby sales areas

View more this category

Customer reviews​

Recommendation level   4.5

Currently, 617 reviews have been posted.